Application Life Cycle Management (ALM) Tool
The Austin Energy Department (AE) with the City of Austin seeks information on commercially available ALM/Source Code Management tools to be used in the Austin Energy Information Technology division. The Austin Energy Information Technology division has identified a need for a robust Application Lifecycle Management that is an on-premise application (workstation or server) but is open to SaaS alternatives that will ensure application life cycle management.
Turfgrass (Sod and Sprigs) Installation and Delivery
The purpose of this solicitation is to supply and install dense and high-traffic tolerant turfgrass (sod and sprigs) at Golf Courses, Parks, Cemeteries, and other City locations.
Kitchen Equipment Maintenance and Repair
To provide kitchen equipment maintenance and repair for all City departments at various locations.
Givens District Park -- Recreation Center Renovation
Replacement of flat membrane roof and four HVAC units, in addition to other items identified in the recently completed facility assessment.
NEW ANTIFREEZE DELIVERY AND PICK UP SERVICE
The City of Austin (City) seeks to establish a contract with a qualified Contractor to provide New/Virgin Yellow Extended Life Organic Acid Technology (OAT) Antifreeze for City of Austin vehicles and equipment; pick up of used antifreeze for disposal
Onsite BHS Maintenance & Repair Support Services
Baggage Handling System Operations and Maintenance Services for Aviation
Emergency Catering Services
This solicitation is to establish an Emergency Catering Services contract. It’s function is to provide meals for City emergency workers, the Emergency Operations Center, and evacuees from natural disasters and other emergency situations such as Winter Storm Mara or Hurricane Katrina. This is an emergency contract with no fixed budget. Contingency funds to be utilized.
RFI for eHealth Records
RFI for eHealth Records. Amy Schillerstrom with CTM will be the contact for the vendors
2024 Large Scale W&WW Pipeline Eng. Services RL
Our current 2022 large diameter pipeline rotation is 11 firms. We are currently in the need of a new large scale pipeline rotation list. We plan to continue with 11 firms and the amount of authorization is slightly being increased to due increased costs we are seeing for engineering work and other items.
Outside Audit of Workers Comp TPA
The contractor shall be a qualified workers’ compensation claims auditing firm to provide a comprehensive workers’ compensation claims management audit of its Third-Party Administrator and Utilization Review Agent.
Decal Making Supplies
Provide Gerber and 3M manufactured decal-making or removing supplies for City vehicles and equipment. Equivalent brands may be provided with written approval by an authorized City representative.
Language Interpretation Services
The City seeks various qualified Contractors to provide language interpretation services for the City of Austin on an as-needed basis.
Street Lighting Const: Pearce Ln & Various City Intersection
Street lighting improvements to upgrade dark environmental conditions to recommended street illumination standards on Pearce Lane from SH 130 to the City Limits. This project also includes illumination of up to 13 City intersections. Project includes installing new pole with new LED luminaires, adding new LED luminaires to existing transmission poles, and, replacing existing high sodium bulbs with LED bulbs
Walnut Creek - January Dr Flood Risk Reduction Project
January Drive Storm drain project is intended to reduce the risk of flooding of buildings, yards, and streets through an upgraded storm drainage system that includes the construction of approximately 1,700 linear feet of upgraded storm drain pipe.
LADY BIRD LAKE BORE FOR PEDERNALES RECONDUCTOR
The Work consists of an approximate 1400 linear foot horizontal directional bore under Lady Bird Lake for the installation of a 36 inch outside diameter high density polyethylene casing pipe with 12 – 3 inch HDPE carrier pipe, including 2 electrical manholes, electrical duct bank and other incidental construction. Electrical conductors will be provided and installed by Austin Energy.
Ivanhoe Trail Water and Wastewater Pipeline Renewal
This project will replace approximately 4,500 linear feet of existing 6-inch AC water line with 8-inch PVC pipes in Ivanhoe Trail and Jubilee Trail on south of W Slaughter Ln. This project will replace aging and deteriorated water mains as part of the Renewing Austin Program.